HOT TOPICS:  Message Board  |  Mobile App  |  iPad App  |  Renew Season Tickets

Inside The Bills

UPDATE: Construction at RWS

Posted by Dallas Miller on November 20, 2013 – 6:23 pm

DSC_0506Here’s a quick update on the ongoing construction at Ralph Wilson Stadium:

Completed Work
-Various concrete repairs throughout  the stadium
-2 new wheelchair platforms in the lower seating bowl.
-4 new wheelchair platforms in the upper seating deck.
-Radiant heating units have been installed in the red club level seats. (we’ll have more on this in the near future)
-Spray-on insulation and freeze protection have been added to exposed water and drainage pipes above the 100 level concourse.

On-Going Work
Operations building
-By the end of next week, paving and curbs will be complete, concrete floor will be poured and the roof panels will be installed.
-Completion of building is expected by January, 2014.

Commissary Building
-Steel framing started on November 19th, 2013 and will be complete by Thanksgiving.
-Exterior wall panels will be installed after Thanksgiving.
-Completion of building is expected by June, 2014.

PHOTOS: Stadium Renovation Renderings
READ: Upgraded Ralph Wilson Stadium will have different feel in 2014


Posted in Inside the Bills